GN Power F7A – DEPOSIT

In stock

$100.00

Expected Q1 2023

Description

We are excited to offer F7’s this time!  This selection is for the SINGLE F7A.   DEPOSIT ONLY

Broadway Limited will be producing these exclusively for Lowell Smith Signature Series. For use in RailSmith production of the Great Northern Empire Builder.  Road number for this single unit will be #362A

This engine will come equipped with DCC and Sound!

This deposit will be applied to the total cost, we anticipate to be $249 . You will receive a final billing when delivery is close. 

This run size will be set by these reservations. Your reservation today will assure you get this engine. Don’t forget to also reserve the F7A&B set on that items separate page.  

Additional information

Motor Selection

DC- $ 139, DCC- $189, DCC sound- $244

$100.00

In stock

Latest On The Track

Jerry

I really am enjoying what you are producing, Lowell! Thanks for doing it. Jerry

J D

Thanks, Lowell, for another awesome addition to an already incredible train.

D.G.

Nothing better than receiving that white box from Lowell Smith.

G.P.

I just received the “The Great Locomotive Chase” set from the Walt Disney Family Museum. Very nicely done!

J. LaBoda

To say the least this is a HUGE development for N-scale and I, along with a number of others, are indebted to you for making these cars possible. Thanks so very much!!!

D.

“You have no idea how excited I am about these cars . . .”

A.M.

“You seem to be the shining light in an industry that’s seen a lot of change since the early 2000’s when I was last in the hobby”.

Jeff B.

Keep up setting the bar high and providing a product that exceeds expectations.

K L

What a trip! We had a great time- exceeded our expectations by a mile. The Silver Lariat was simply stunning. A gem on the rails. The scenery and weather were perfect. The delays were not an issue for us at all. All just a good days work on the railroad! Thank you for all the…

G.D.

Lowell, thanks to you and your company SP&S modelers (myself included) are having a much easier time modeling the North Bank Road. Thank you for your hard work!